The
following are examples of some of the larger projects under- taken
by GlobeLink Telecom principals in the last several years:
-
They
provided an extensive array of fixed price and T&E services
on a major cellular provider project to change an 88 hop 2 GHz system to
a combination 6 and 11 GHz SONET system for the
State Police of a Southern state. GlobeLink Telecom's field manager supervised the entire
project for the customer. Riggers used by GlobeLink Telecom
installed 196 standard, HP, and UHX antenna systems and
removed the existing system. Our technicians commissioned
62 hops on two of three rings and contributed to commissioning
the rest on a T&E basis.
-
GlobeLink Telecom principals
engineered, installed, and commissioned a 16-hop OC-12
microwave system for a major project in Hawaii. This project
was a virtual turnkey assignment.
-
Our team members have installed and oriented 29 earth stations
in remote western Alaska for a major communications company. Fourteen of the 29 earth
stations were operational and our teams were tasked with installing
new shelters and re-commissioning the system. The other 15
earth stations were new 3.6 meter uplinks. The logistics of
this project were complex since there were limited services
available in most of the locations and the equipment weighed
over five tons. The project was completed on schedule.
|
For More
Information, please contact our corporate office:
6935 Jewel Lake Rd.
Anchorage, AK 99502
Phone: 907.243.0118
Fax: 907.245.0609
dboling@globelinktel.com
|

|
© Globelink Telecom
2005
|